Production monitoring for offshore wind farms

Component safety starts during production — with 8.2 offshore experience
Offshore wind energy projects place the highest demands on manufacturing quality — because corrections on the high seas are cost-intensive, complex and time-critical. The basis for successful plant operation is therefore already laid at the plant.
8.2 accompanies your offshore projects with independent production monitoring — from the evaluation of individual components to final approval before sea transport. We test with technical depth, systematically and locally at manufacturers and suppliers.

Our services for offshore manufacturing projects
Supplier audits & initial sample tests
- Factory audits of casting, electrical and component suppliers worldwide
- Carrying out First Article Inspections (FAI) for quality assurance before series production starts
Support for pre-series production
- Review of manufacturing documents and design approvals
- Process analyses to optimize processes and test steps
- Early identification of potential material or design weaknesses
{{quote}}
Series production & final inspection
- Incoming goods inspections and assembly inspections in the production hall
- Inspection of rotor blades, towers, generators, hubs and system components
- Continuous on-site support with test reports and tracking lists
- Final walkdowns before loading into the offshore wind farm

Why 8.2 for offshore manufacturing monitoring?
- Internationally connected and over 15 years of experience with major offshore projects and leading OEMs
- Detailed knowledge of materials and manufacturing technologies (e.g. welding technology, storage technology, corrosion protection)
- Support for numerous plant types up to series production — regardless of manufacturer
- Familiar with plant procedures, certification processes and maritime logistics
- All monitoring results legally documented and comprehensible at any time
With 8.2, you lay the foundation for long-lasting offshore systems — safely manufactured, tested, documented and ready for challenges at sea.
Sven Tannert (EnBW AG)
Monitoring and production monitoring are crucial components for the success of a project such as EnBW He Dreiht. EnBW AG is all the more pleased that, following an intensive tendering process, an important part of this work has been awarded to such an experienced and renowned partner as 8.2 Consulting AG.
Please contact us

We are happy to help you.
Find out how we can help you find and implement sustainable energy solutions.