8.2 Consulting AG compiled a quality assessment for Gemini Project

Based on our extensive experience with the Siemens G4 platform from the projects Meerwind S/O, DanTysk, Butendiek and EnBW Baltic2 during production, installation and operation, Gemini has contracted 8.2 to assess the performance of Siemens Wind Power during assembly.

The assessment focuses on timelines for assembly of hubs, nacelles and blades in the different factories. Furthermore the product quality and the related as built documentation has been evaluated.

For the fast development of new offshore wind turbine types and the upcoming tender phase – quality is key.

With its vast experience gathered by assessing more than 500 offshore turbines in different states including design reviews of all major turbine types – 8.2 Consulting AG was able to conduct this WTG supplier performance assessment.

8.2 Consulting is currently involved during the production surveillance for the offshore wind farm Sandbank (SWT-4.0) and performed more than 2.7 GW offshore due diligence services based on in-depth technical knowledge.